May 4, 2010, Bond Request Project List
Thank You Voters
We appreciate your continued confidence in Kalamazoo Public Schools. The following is a list of the capital projects to be accomplished from this $62 million bond:
Arcadia Elementary
Replace asphalt paving
Install concrete pads around paved catch basins
Install barrier-free ramp and handrails at main entry
Install barrier-free access at exterior stoops
Replace masonry screen wall at entry
Replace corridor coat hooks with lockers and replace existing lockers
Replace boiler
Replace Media Center air handling unit and add cooling
Replace Office area air handling unit and add cooling
Replace Cafeteria air handling unit and add cooling
Replace 2 HW circulation pumps including valves and piping
Replace pneumatic controls air dryer
Replace classroom unit ventilators and add cooling
Replace/add site lighting
Edison Environmental Science Academy
1929 Building
Install barrier-free access at south entry stoop
Install barrier-free access at Gymnasium exits
Add barrier-free access to stage
Replace public address system
1958 Building
Install barrier-free access at exterior stoops
Install elevator for access to second floor
Replace all windows and retrofit panels
Replace exterior doors
Add second floor corridor lockers
Provide rated separation for egress stairs
Replace site lighting
Replace public address system
El Sol Elementary
1924 Building
Remodel third floor for occupancy
Replace public address system
Replace master clock system - including main panel
1963 Building
Oak Street sidewalks need barrier-free curb cuts
Provide accessible ramp to main entry
Replace roofing and insulation
Replace exterior downspouts with new internal system
Replace public address system
Replace master clock
Greenwood Elementary
Separate bus and visitor parking areas
Install concrete pads around paved catch basins
Remove/replace asphalt paving
Replace roof
Remodel toilet rooms
Replace floor tile in gymnasium
Replace/add site lighting
Replace public address system
Indian Prairie Elementary
Connect bus loop sidewalk to Grand Prairie and add marked crosswalk
Install barrier-free access at exterior stoops
Replace Cafeteria and stage lighting
Replace gymnasium lighting
Replace remaining site lighting
Replace public address system
King-Westwood Elementary School
Replace north parking lot and drives
Install barrier-free access at exterior stoops
Replace Office air handling equipment
Replace drinking fountains
Widen sidewalk in front of school
Lincoln International Studies School
Install concrete at catch basins in asphalt paving
Remove replace heavy duty asphalt paving
Install ramps at exterior exit doors for accessibility
Replace classroom ceilings
Replace fire escape on north end
Relocate gas shutoff to outside of Boiler room
Replace pneumatic controls air dryer
Replace storm drain backwater valve
Replace DHW circulating pump
Replace classroom lighting
Replace exterior building lighting
Add site lighting
Install occupancy lighting sensors throughout
Replace public address system
Milwood Elementary School
1921 Building
Install barrier-free access at exterior stoops
Replace lintels, re-tuck-point, and repair masonry
Replace fire alarm system
1949 Building
Replace entrance canopies
Install barrier-free access at exterior stoops
Replace entire fire alarm system
Replace site lighting fixtures
Northeastern Elementary School
Replace asphalt parking lots and circle drive
Install concrete pads around paved catch basins
Install barrier-free access at exterior stoops
Replace Gymnasium/Locker Room roofs
Replace fire alarm system
Replace/add site lighting
Northglade Montessori Magnet School
Install barrier free access at exterior stoops
Install playground equipment
Replace corridor lights in 1959 section
Parkwood-Upjohn Elementary School
Install barrier-free access at exterior stoops
Widen sidewalk in front of school
Repair foundation cracks
Replace lintels and re-tuck-point and repair masonry as needed
Replace windows
Replace exterior doors and frames
Spring Valley Center for Exploration
Replace pneumatic controls compressor & air dryer
Replace lighting in 1956 and 1958 Sections
Install occupancy lighting sensors
Install generator and emergency lighting
Washington Writers' Academy
Construct new elementary school
Winchell Elementary School
Remove and replace asphalt pavement
Replace hard surface play areas
Install barrier-free access at exterior stoops
Install barrier-free access to stage
Replace pneumatic controls air compressor and air dryer
Replace/add site lighting
Replace the public address system
Woods Lake Elementary: A Magnet Center for the Arts
East side ramp development
Add handrails at stairs and ramp from lower parking lot
Install stair access to play fields
Install walkway path and landscaping to Main Office entry
Install barrier-free curb cuts to exterior curbs
Install barrier-free access at exterior stoops
Replace ceilings
Install acoustical ceiling in Music Room
Replace Kitchen ceiling
Replace Kitchen lighting
Replace boiler and piping
Replace boiler feed unit
Replace pneumatic controls air compressor & air dryer
Replace two valves at water meter
Replace lighting in Music Room
Replace T-12 lighting with T-8
Replace/add site lighting
Replace the public address system
Woodward School for Technology and Research
Install concrete pads around paved catch basins
New 48-inch drywell
Concrete curb and gutter
Replace asphalt in courtyard and by building
Remove and replace asphalt paving
Remove and replace asphalt for track
Provide barrier-free access to Annex entries
Install barrier-free access to stage
Replace roof on single story addition
Replace cracked sections of foundation wall
Portions of exterior masonry and control joints should be replaced
Replace all windows
Replace original exterior doors, frame, and hardware
Replace air dryers
Replace/add site lighting
Hillside Middle School
Replace asphalt paving
Install barrier-free access at exterior stoops
Install barrier-free access to stage
Replace flooring
Replace fire alarm system
Replace Gymnasium air handling units
Replace air dryer
Replace public address system
Construct addition to school
Maple Street Magnet School for the Arts
Remove and replace concrete steps with railings
Replace remaining asphalt paving
Install concrete pads around paved catch basins
Install fencing at boiler House roof
Replace stoops for barrier-free access
Replace poorly sealed penetrations on exterior of building
Install barrier-free access to stage
Remodel locker rooms, lobby and Gymnasium
Replace Kitchen air handling unit
Replace Cafeteria air handling unit
Replace air dryer
Install cross contamination protection on water supply
Replace and add site lighting
Replace public address system and associated wiring and speakers
Milwood Magnet School Center for Math, Science and Technology
Separate student drop off and parent parking
Replace asphalt parking
Install barrier-free access at exterior stoops
Install barrier-free access to stage
Refinish Gymnasium floor
Replace fire alarm system
Replace air dryer
Replace drinking fountains
Replace public address system
Construct addition to school
Kalamazoo Central High School
Remove/replace standard duty asphalt
Install concrete at parking lot catch basins
Install concrete steps with rail at Locker Rooms
Install barrier-free access and parking to athletic fields
Add barrier-free curb cuts to sidewalks
Install barrier-free access at exterior stoops
Provide barrier-free access to pool bleacher area
Make varsity locker rooms accessible
Replace overhead doors at Drivers' Training classroom
Remodel science rooms
Remodel Room 535 into Drafting Lab
Purchase equipment and equipment for Room 553 computer lab
Refinish Gymnasium floor
Provide pool cover
Replace pool air handling equipment with heat recovery
Replace air dryer
Install pool dehumidification system with heat recovery
Replace corroded water piping from boiler room to equipment room
Replace all remaining T-12 light fixtures with T-8
Replace Boiler Room lights
Improve under soffit lighting around 3-story building with controls
Install lighting along football field and baseball fields
Replace site lighting and poles around shop wing
Improve Gymnasium Main Entrance lighting, exterior
Install occupancy lighting sensors in all classrooms and restrooms
Install generator and emergency lighting
Loy Norrix High School
Replace exterior concrete stairs and railings
Remove and replace concrete walks
Remove and replace Receiving Area asphalt
Replace football stadium bleachers
Install accessible route (concrete walk) to athletic facilities
Install barrier-free access at exterior stoops
Provide elevator to stair tower for barrier-free access
Replace pool, J-unit, Auditorium and stair tower roof
Replace pool timing system
Add steam exchanger and piping controls to pool heating system
Replace visual displays (markerboards and tackboards)
Replace fire alarm system
Replace cooling tower pump
Replace all fin tube in commons area A, B, C pod ramps
Replace air handing units in Auxiliary Gymnasium
Replace air handling units in A, Choir, 2 Pool area air handling units and Band Rooms
Replace pneumatic controls with DDC
Install pool dehumidification system with heat recovery
Add pool cover
Repair/replace downspouts
Replace primary switch & transformers East of Auditorium Drive
Replace exterior lighting around building North of Auditorium Drive
Upgrade emergency lighting in Auditorium
Install occupancy lighting sensors in all classrooms and restrooms
Install transfer switch for Office, Technology Closet and Security System
Phoenix High School
Remodel Room 1 into Science Lab
Replace asphalt parking lot
Replace concrete at Loading Dock where it has crumbled
Replace air dryer
Replace drinking fountains
Replace/add site lighting
Replace master clock and secondary clocks
Administration Building
Install handrails at sidewalk steps
Replace west entry guardrail
Relocate barrier-free toilet for second means of egress from South Office area
Replace handrail and guardrail at north stair
Replace steam boiler with hot water and heating distribution piping
Replace penthouse air handling units and cooling tower
Community Education Center
Replace heavy duty concrete
Install barrier-free access at exterior stoops
Roof replacement in areas A and C
Remodel KAMSC
Replace pneumatic controls air dryer
Connect technology closets and security system to generator
Lake Street Barns
Re-grade site and install asphalt pavement and improved site drainage
Replace/add exterior site lighting
Oakwood Elementary School
Replace boiler and piping
West Main School Professional Development Center
Replace roof
Install generator and emergency lighting
District-wide Items – Facilities Management
Playground equipment
District-wide Items - Business Office
Bus replacement
Technology equipment
Library books
Food Service equipment
Equipment replacement
Furniture replacement
Art / Music equipment replacement
Bond issuance costs, less interest earnings
District
- Board of Education
- Initiatives and Supporters
- About KPS
- Overview and Demographics
- Curriculum
- Special Programs
- Extracurricular Activities
- District Map
- District Budgets
- Annual Reports
- 2007-2008 District
- 2007-2008 Schools
- 2008-2009 District
- 2008-2009 Schools
- 2009-2010 District
- 2009-2010 Schools
- 2010-2011 District
- 2010-2011 Schools
- Arcadia Elementary
- Central High School
- Edison Elementary
- El Sol Elementary
- Greenwood Elementary
- Hillside Middle School
- Indian Prairie Elementary
- King-Westwood Elementary
- Lincoln Elementary
- Linden Grove Middle School
- Loy Norrix High School
- Maple Street Magent
- Milwood Elementary
- Milwood Magnet
- Northeastern Elementary
- Northglade Elementary
- Parkwood-Upjohn Elementary
- Phoenix High School
- Prairie Ridge Elementary
- Spring Valley Elementary
- Washington Elementary
- Winchell Elementary
- Woods Lake Elementary
- Woodward Elementary
- Annual Notifications
- Enrollment
- Strategic Planning
- Testimonials
- Departments
- Adult & Community Education
- Library Services
- Office of the Superintendent
- Auditoriums
- Business, Communications and Operations
- Human Resources
- Student Services
- Teaching and Learning Services
- Bilingual and ESL Program
- Academically Talented Program
- Assessment Department
- Athletics
- Curriculum, Instruction and Professional Development
- Early Childhood Education
- Elementary Education
- English Language Arts
- Fine Art
- Instructional Technology
- Library Services
- Magnet Programs
- Mathematics
- Algebra II Mathematics
- Best Practices
- Geometry Mathematics
- Grade 1 Mathematics
- Grade 2 Mathematics
- Grade 3 Mathematics
- Grade 4 Mathematics
- Grade 5 Mathematics
- Grade 6 Mathematics
- KPS Mathematics
- Kindergarten Mathematics
- Mathematics Literacy
- Mathematics Program Principles
- Process Standards
- Program Overview
- Strategic Math
- Performing Arts
- Secondary Education
- Social Studies
- Title I and School Improvement
- West Main Professional Development
- World Languages
- Communities in Schools of Kalamazoo
- Schools
- Elementary Schools
- Arcadia Elementary
- Edison Elementary
- El Sol Elementary
- Greenwood Elementary
- Indian Prairie Elementary
- King Westwood Elementary
- Lincoln Elementary
- Milwood Elementary
- Northeastern Elementary
- Northglade Elementary
- Parkwood Upjohn Elementary
- Prairie Ridge Elementary
- Spring Valley Elementary
- Washington Elementary
- Winchell Elementary
- Woods Lake Elementary
- Woodward Elementary
- Middle Schools
- High Schools
- Elementary Schools
- Employment