May 4, 2010, Bond Request Project List

Thank You Voters


We appreciate your continued confidence in Kalamazoo Public Schools. The following is a list of the capital projects to be accomplished from this $62 million bond:


 


Arcadia Elementary


Replace asphalt paving


Install concrete pads around paved catch basins


Install barrier-free ramp and handrails at main entry


Install barrier-free access at exterior stoops


Replace masonry screen wall at entry


Replace corridor coat hooks with lockers and replace existing lockers


Replace boiler


Replace Media Center air handling unit and add cooling


Replace Office area air handling unit and add cooling


Replace Cafeteria air handling unit and add cooling


Replace 2 HW circulation pumps including valves and piping


Replace pneumatic controls air dryer


Replace classroom unit ventilators and add cooling


Replace/add site lighting


 


Edison Environmental Science Academy


1929 Building


Install barrier-free access at south entry stoop


Install barrier-free access at Gymnasium exits


Add barrier-free access to stage


Replace public address system


 


1958 Building


Install barrier-free access at exterior stoops


Install elevator for access to second floor


Replace all windows and retrofit panels


Replace exterior doors


Add second floor corridor lockers


Provide rated separation for egress stairs


Replace site lighting


Replace public address system


 


El Sol Elementary


1924 Building


Remodel third floor for occupancy


Replace public address system


Replace master clock system - including main panel


 


1963 Building


Oak Street sidewalks need barrier-free curb cuts


Provide accessible ramp to main entry


Replace roofing and insulation


Replace exterior downspouts with new internal system


Replace public address system


Replace master clock


 


Greenwood Elementary


Separate bus and visitor parking areas


Install concrete pads around paved catch basins 


Remove/replace asphalt paving


Replace roof


Remodel toilet rooms


Replace floor tile in gymnasium


Replace/add site lighting


Replace public address system


 


Indian Prairie Elementary


Connect bus loop sidewalk to Grand Prairie and add marked crosswalk


Install barrier-free access at exterior stoops


Replace Cafeteria and stage lighting


Replace gymnasium lighting


Replace remaining site lighting


Replace public address system


 


King-Westwood Elementary School


Replace north parking lot and drives


Install barrier-free access at exterior stoops


Replace Office air handling equipment


Replace drinking fountains


Widen sidewalk in front of school


 


Lincoln International Studies School


Install concrete at catch basins in asphalt paving


Remove replace heavy duty asphalt paving


Install ramps at exterior exit doors for accessibility


Replace classroom ceilings


Replace fire escape on north end


Relocate gas shutoff to outside of Boiler room


Replace pneumatic controls air dryer


Replace storm drain backwater valve


Replace DHW circulating pump


Replace classroom lighting


Replace exterior building lighting


Add site lighting


Install occupancy lighting sensors throughout


Replace public address system


 


Milwood Elementary School


1921 Building


Install barrier-free access at exterior stoops


Replace lintels, re-tuck-point, and repair masonry


Replace fire alarm system


 


1949 Building


Replace entrance canopies


Install barrier-free access at exterior stoops


Replace entire fire alarm system


Replace site lighting fixtures


 


Northeastern Elementary School


Replace asphalt parking lots and circle drive


Install concrete pads around paved catch basins


Install barrier-free access at exterior stoops


Replace Gymnasium/Locker Room roofs


Replace fire alarm system


Replace/add site lighting


 


Northglade Montessori Magnet School


Install barrier free access at exterior stoops


Install playground equipment


Replace corridor lights in 1959 section


 


Parkwood-Upjohn Elementary School


Install barrier-free access at exterior stoops


Widen sidewalk in front of school


Repair foundation cracks


Replace lintels and re-tuck-point and repair masonry as needed


Replace windows


Replace exterior doors and frames


 


Spring Valley Center for Exploration


Replace pneumatic controls compressor & air dryer


Replace lighting in 1956 and 1958 Sections


Install occupancy lighting sensors


Install generator and emergency lighting


 


Washington Writers' Academy


Construct new elementary school


 


Winchell Elementary School


Remove and replace asphalt pavement


Replace hard surface play areas


Install barrier-free access at exterior stoops


Install barrier-free access to stage


Replace pneumatic controls air compressor and air dryer


Replace/add site lighting


Replace the public address system


 


Woods Lake Elementary: A Magnet Center for the Arts


East side ramp development


Add handrails at stairs and ramp from lower parking lot


Install stair access to play fields


Install walkway path and landscaping to Main Office entry


Install barrier-free curb cuts to exterior curbs


Install barrier-free access at exterior stoops


Replace ceilings


Install acoustical ceiling in Music Room


Replace Kitchen ceiling


Replace Kitchen lighting


Replace boiler and piping


Replace boiler feed unit


Replace pneumatic controls air compressor & air dryer


Replace two valves at water meter


Replace lighting in Music Room


Replace T-12 lighting with T-8


Replace/add site lighting


Replace the public address system


 


Woodward School for Technology and Research


Install concrete pads around paved catch basins 


New 48-inch drywell


Concrete curb and gutter


Replace asphalt in courtyard and by building


Remove and replace asphalt paving


Remove and replace asphalt for track


Provide barrier-free access to Annex entries


Install barrier-free access to stage


Replace roof on single story addition


Replace cracked sections of foundation wall


Portions of exterior masonry and control joints should be replaced


Replace all windows


Replace original exterior doors, frame, and hardware


Replace air dryers


Replace/add site lighting


 


Hillside Middle School


Replace asphalt paving


Install barrier-free access at exterior stoops


Install barrier-free access to stage


Replace flooring


Replace fire alarm system


Replace Gymnasium air handling units


Replace air dryer


Replace public address system


Construct addition to school


 


Maple Street Magnet School for the Arts


Remove and replace concrete steps with railings


Replace remaining asphalt paving


Install concrete pads around paved catch basins


Install fencing at boiler House roof


Replace stoops for barrier-free access


Replace poorly sealed penetrations on exterior of building


Install barrier-free access to stage


Remodel locker rooms, lobby and Gymnasium


Replace Kitchen air handling unit


Replace Cafeteria air handling unit


Replace air dryer


Install cross contamination protection on water supply


Replace and add site lighting


Replace public address system and associated wiring and speakers


 


Milwood Magnet School Center for Math, Science and Technology


Separate student drop off and parent parking


Replace asphalt parking


Install barrier-free access at exterior stoops


Install barrier-free access to stage


Refinish Gymnasium floor


Replace fire alarm system


Replace air dryer


Replace drinking fountains


Replace public address system


Construct addition to school


 


Kalamazoo Central High School


Remove/replace standard duty asphalt


Install concrete at parking lot catch basins


Install concrete steps with rail at Locker Rooms


Install barrier-free access and parking to athletic fields


Add barrier-free curb cuts to sidewalks


Install barrier-free access at exterior stoops


Provide barrier-free access to pool bleacher area


Make varsity locker rooms accessible


Replace overhead doors at Drivers' Training classroom


Remodel science rooms


Remodel Room 535 into Drafting Lab


Purchase equipment and equipment for Room 553 computer lab


Refinish Gymnasium floor


Provide pool cover


Replace pool air handling equipment with heat recovery


Replace air dryer


Install pool dehumidification system with heat recovery


Replace corroded water piping from boiler room to equipment room


Replace all remaining T-12 light fixtures with T-8


Replace Boiler Room lights


Improve under soffit lighting around 3-story building with controls


Install lighting along football field and baseball fields


Replace site lighting and poles around shop wing


Improve Gymnasium Main Entrance lighting, exterior


Install occupancy lighting sensors in all classrooms and restrooms


Install generator and emergency lighting


 


Loy Norrix High School


Replace exterior concrete stairs and railings


Remove and replace concrete walks


Remove and replace Receiving Area asphalt


Replace football stadium bleachers


Install accessible route (concrete walk) to athletic facilities


Install barrier-free access at exterior stoops


Provide elevator to stair tower for barrier-free access


Replace pool, J-unit, Auditorium and stair tower roof


Replace pool timing system


Add steam exchanger and piping controls to pool heating system


Replace visual displays (markerboards and tackboards)


Replace fire alarm system


Replace cooling tower pump


Replace all fin tube in commons area A, B, C pod ramps


Replace air handing units in Auxiliary Gymnasium


Replace air handling units in A, Choir, 2 Pool area air handling units and Band Rooms


Replace pneumatic controls with DDC


Install pool dehumidification system with heat recovery


Add pool cover


Repair/replace downspouts


Replace primary switch & transformers East of Auditorium Drive


Replace exterior lighting around building North of Auditorium Drive


Upgrade emergency lighting in Auditorium


Install occupancy lighting sensors in all classrooms and restrooms


Install transfer switch for Office, Technology Closet and Security System


 


Phoenix High School


Remodel Room 1 into Science Lab


Replace asphalt parking lot


Replace concrete at Loading Dock where it has crumbled


Replace air dryer


Replace drinking fountains


Replace/add site lighting


Replace master clock and secondary clocks


 


Administration Building


Install handrails at sidewalk steps


Replace west entry guardrail


Relocate barrier-free toilet for second means of egress from South Office area


Replace handrail and guardrail at north stair


Replace steam boiler with hot water and heating distribution piping


Replace penthouse air handling units and cooling tower


 


Community Education Center


Replace heavy duty concrete


Install barrier-free access at exterior stoops


Roof replacement in areas A and C


Remodel KAMSC


Replace pneumatic controls air dryer


Connect technology closets and security system to generator


 


Lake Street Barns


Re-grade site and install asphalt pavement and improved site drainage


Replace/add exterior site lighting


 


Oakwood Elementary School


Replace boiler and piping


 


West Main School Professional Development Center


Replace roof


Install generator and emergency lighting


 


District-wide Items – Facilities Management 


Playground equipment


 


District-wide Items - Business Office


Bus replacement


Technology equipment


Library books


Food Service equipment


Equipment replacement


Furniture replacement


Art / Music equipment replacement


Bond issuance costs, less interest earnings